Abstract

This paper presents a modeling methodology used to predict the performance of a flexible structure, such as a space telescope, in the presence of an on-board vibrational disturbance source, such as a reaction wheel assembly (RWA). Both decoupled and coupled analysis methods are presented. The decoupled method relies on blocked RWA disturbances, measured with the RWA hardmounted to a rigid surface. The coupled method corrects the blocked RWA disturbance boundary conditions using "force filters," which depend on estimates of the interface accelerances of the RWA and space-craft. Both methods were validated on the Micro-Precision Interferometer testbed at the Jet Propulsion Laboratory. Experimental results are encouraging, indicating that both methods provide sufficient accuracy compared to measured values; however, the coupled method provides the best results when the gyroscopic nature of the spinning RWA is captured in the RWA accelerance model. Additionally, the RWA disturbance cross spectral density terms are found to be influential.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Neville, T., Sievers, L., Basdogan, I., Dekens, F., Elias, L. M.. 2002-08-22. A methodology for modeling the mechanical interaction between a reaction wheel and a flexible structure. https://ntrs.nasa.gov/citations/20210005498

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Swamp Works Regolith Compaction Technologies

While the level of compaction below the lunar surface increases quickly after only a few cm of depth, in many cases during a construction mission there will be a need to excavate and transport regolith to a new location for cut-and-fill or horizontal construction of structures such as berms. In these cases to achieve high levels of bulk density, compaction must be per-formed. Additionally, in some cases surface technolo-gies such as systems that sinter/melt the surface may desire the maximum possible compaction at the sur-face to improve melting/heating performance and the final material strength properties. Kennedy Space Center’s (KSC) Swamp Works has developed two means of compaction, lunar and mar-tian compaction. Planetary Autonomous Compaction Technology (PACT) which is part of the Multifunction End Effector for Regolith Compaction Acquisition and Transfer (MEERCAT [1]) robotic arm end effector system’s capabilities and the Site Preparation Tooling for Operations on Mobility Platforms (STOMP [2]) vibratory roller compactor. PACT on MEERCAT has been demonstrated to a TRL 5 and STOMP to a TRL 4 in ambient testing. The results of PACT on MEERCAT and STOMP testing will be shared with results for various simulants including BP-1, ICN-LHT-1G (aka CSM-LHT-1G), RDW-LHT-1GH (a simulant developed for the Mason Tipping Point to match characteristics of ICN-LHT-1G), and Exolith LHS-1E. This will also include discus-sions on methods used to verify relative density before and after compaction and means to verify density effects below depth. To calculate relative density, maximum and minimum densities for simulants were taken from literature [3] [4] [5] and additional lab test-ing (publication in work).

vibration↗

A New Large Vibration Test Facility Concept for the James Webb Space Telescope

The James Webb Space Telescope consists of three main components, the Integrated Science Instrument Module (ISIM) Element, the Optical Telescope Element (OTE), and the Spacecraft Element. The ISIM and OTE are being assembled at the National Aeronautics and Space Administration's Goddard Spaceflight Center (GSFC). The combined OTE and ISIM Elements, called OTIS, will undergo sine vibration testing before leaving Goddard. OTIS is the largest payload ever tested at Goddard and the existing GSFC vibration facilities are incapable of performing a sine vibration test of the OTIS payload. As a result, a new large vibration test facility is being designed. The new facility will consist of a vertical system with a guided head expander and a horizontal system with a hydrostatic slip table. The project is currently in the final design phase with installation to begin in early 2015 and the facility is expected to be operational by late 2015. This paper will describe the unique requirements for a new large vibration test facility and present the selected final design concepts.

vibration↗