Search NASA⌕ Search

NASA NTRS · 20210017724

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

Abstract

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Min Xue. 2021-08-07. Coordination between Federated Scheduling and Conflict Resolution in UAM Operations. https://ntrs.nasa.gov/citations/20210017724

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗