In 2014, in response to a large volume of feedback from industry, the science community, and internal to Goddard Space Flight Center (GSFC), GSFC’s Safety and Mission Assurance (SMA) Directorate began a transition to a risk-based implementation of SMA, departing from its longstanding practice of being primarily driven by a mostly static set of Mission Assurance Requirements. The transition started out with a pilot project involving risk-based acceptance of bare-printed circuit boards that was enormously successful, continued through a complete organizational transformation in 2015, and culminated with the baselining of formal Risk-Based SMA policy in 2016. In this presentation we will describe the risk-based SMA concept, segue into how it shapes a modernization of risk classification that GSFC has rolled out, and provide results from the original pilot project for risk-based SMA, involving the printed circuit board assurance process.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Jesse Leitner. Risk-Based SMA and Modernizing Risk Classification at GSFC. https://ntrs.nasa.gov/citations/20230002949

Cite the original work for its findings. Save a collection to share your selection of sources.