Search NASA⌕ Search

NASA NTRS · 20230005832

EVA Hand Tool Design Considerations, Development, and General Requirements Interpretation: A Junior Engineer’s Guide

Abstract

This paper serves as a guide to developing hand tools for use by crewmembers during extravehicular activity (EVA) in outer space. It outlines the fundamentals of EVAs and related provisions, providing a starting point and perspective for engineers unfamiliar with designing equipment to be used during manned spaceflight. Common EVA hardware constraints, which are often unclear, are interpreted and traced back to a source or justification because, as in any design field, fully understanding the basis and intent of a design requirement is needed to properly satisfy it. Lastly, miscellaneous design considerations and lessons learned in tool development are discussed. The information found within is drawn from commonly cited NASA and EVA related documents as well as from professional experiences.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kevin Eisenhower. 2008-10-01. EVA Hand Tool Design Considerations, Development, and General Requirements Interpretation: A Junior Engineer’s Guide. https://ntrs.nasa.gov/citations/20230005832

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

EVA Operations for the Artemis III Science Team

The purpose of this presentation is to give the newly selected Artemis III Science Team some basic information on EVA Operations and potential interactions with the science team in both the planning and real-time phases of the mission.

EVA↗

Tenets of Lunar EVAs for Artemis III

The purpose of these top level EVA tenets for Artemis III is to capture and promote EVA planning principles which drive decisions before and during the mission that are related to mission timeline, contingencies, and how risks are balanced. The tenets listed below are not shown in a priority order. (Reference Artemis III Mission Planning Summit, Action 27, 3/9/2023).

EVA↗