Search NASA⌕ Search

NASA NTRS · 20230007658

ISS Universal Waste Management System (UWMS) Optical Sensor: Phase 2

Abstract

Collins Aerospace has delivered a new Universal Waste Management System (UWMS) to the International Space Station (ISS), which is not operational, partially due to a faulty urine pretreat concentration sensor. The ISS Program requested help from the NASA Engineering and Safety Center (NESC) in developing such a sensor. The first phase of this effort was to determine if an optical approach was feasible. The second Phase, the topic of this report, was to determine the impact of ISS water contaminants and pretreat aging on the performance of the sensor and to design, construct, and test a prototype sensor.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Upendra N Singh, Christopher Biagi, Tracy L Gibson, Robert C Youngquist. 2023-05-01. ISS Universal Waste Management System (UWMS) Optical Sensor: Phase 2. https://ntrs.nasa.gov/citations/20230007658

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Stress Corrosion Evaluation of Inconel X-750 for the International Space Station Environmental Control and Life Support System

Inconel X-750 alloy was evaluated for stress corrosion in support of the International Space Station Environmental Control and Life Support System. Round tensile specimens that were obtained from 0.25 in thick material successfully completed 365 days of exposure to baseline pretreat, baseline brine, alternate pretreat, alternate brine, and 3.5% NaCl alternate immersion without any failures at stresses of up to 90% of the yield strength. Posttest evaluations consisting of metallography and tensile testing did not indicate stress corrosion susceptibility.

International Space Station↗

Commercial Low-Earth Orbit Destination (CLD) Capabilities of Interest and Resource Needs

The Commercial Low Earth Orbit (LEO) Development Program team has been working with NASA and the International Space Station (ISS) National Lab (NL) stakeholders to identify capabilities of interest to both conduct research/technology demonstrations and estimate the resources that will be needed from Commercial LEO Destinations (CLDs). Through a series of one-on-one and working group meetings with users/stakeholders, hardware items of interest to the user community were identified and converted into capabilities (e.g., centrifugation, microscope, pressure chamber, etc.). In parallel, resources needed to operate the research equipment (e.g., crew time, number of experiments, volume, etc.) were estimated in order for the CLD providers to better understand NASA’s potential future service requirements. The capabilities and the resources included in this White Paper do not represent NASA requirements. Instead, they constitute a preliminary set of potential capability and resource needs collated to guide CLD providers in appropriately sizing and outfitting their CLD designs. NASA is requesting feedback from industry on how these capabilities and resources align with their own needs as well as those of their non-NASA customers. Information on how the capabilities/resources impact the CLD designs is also requested. After assessing industry’s feedback to this white paper, NASA plans to issue a preliminary set of requirements for review.

International Space Station↗

Preparing for Human Missions to Mars: The role of ISS and Artemis as Analogs for Research and Technology Testing

The hazards of spaceflight to the human system are present in in varying degrees on different spaceflight platforms: altered gravity, isolation and confinement, distance from Earth, radiation, and hostile closed environments. A strategic view of the fidelity of hazards experienced on different platforms can shape the testing plans for human research and technology demonstration related to crew health and performance. Working across the international partnership, the International Space Station (ISS) is planning periods of modified operations to improve the fidelity of Mars simulations. To understand transit durations as an independent variable, a series of 1-year, 6-month and 30-45 day missions are being planned on ISS. Standard measurements across ISS missions of different durations, lunar missions and ground analogs offers the opportunity to distinguish different hazards and their effects in the context of the relevance to future mission concepts. The ISS partnership is planning for additional test cases that are aligned with Mars mission plans. (1) Evaluating crew performance capabilities when transitioning to gravity after long durations in microgravity representative of a Mars transit. (2) Simulating crew medical care under Mars-like autonomous operations. (3) Identification and testing of operations under communications delay and autonomy expected for Mars missions and the linked effects on behavioral health and performance of the crew. Artemis missions serve as a valuable analogs for Mars surface operations, with partial gravity and deep space radiation hazards, but with crewmembers that are probably more physically capable than their counterparts would be after a Mars transit. Getting unobtrusive data from early Artemis missions, and knowledge gained from operational experience as Artemis operations develop can improve engineering design, medical requirements and countermeasures, and ultimately ensure mission success on Mars. Linking Mars architectures with the plans and capabilities for ISS and Artemis allows us to plan to most operationally relevant tests of crew health and performance on current spaceflight missions to inform planning for future missions to Mars. By using human spaceflight platforms as well as ground simulation in an integrated way, the international community can improve exploration readiness, develop countermeasures and reduce risks of future human space missions.

International Space Station↗