Search NASA⌕ Search

NASA NTRS · 20240005625

Machine Learning Algorithms for Alignment Verification of the Roman Space Telescope

Abstract

The Nancy Grace Roman Telescope is a NASA observatory designed to unravel the secrets of dark energy and dark matter, search for and image exoplanets, and explore many topics in infrared optics. Scheduled to launch no earlier than October 2026, this 2.4 meter aperture telescope has a field of view 100 times greater than the Hubble Space Telescope. The mission is currently in its construction phase, where the telescope and its two instruments will soon be aligned together to ensure proper pupil matching. To help verify this alignment, multiple point sources above the entrance pupil of the telescope will illuminate the optical path through the telescope-instrument system, and shadows of various obstructions in the system will be analyzed using machine learning algorithms to determine the pupil matching error. This presentation discusses the test approach and the machine learning algorithms employed, as well as our uncertainty predictions based on a modeled Monte-Carlo analysis of the test.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Joseph M. Howard, Robert Campion, Samuel Nissim, Tuong Phong, Ariba Khan, Brian Daley, Sam Becker, Scott Rohrbach, Margaret Dominguez. Machine Learning Algorithms for Alignment Verification of the Roman Space Telescope. https://ntrs.nasa.gov/citations/20240005625

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Ultra-Stable Segmented Telescope Sensing and Control Architecture

The LUVOIR team is conducting two full architecture studies Architecture A 15 meter telescope that folds up in an 8.4m SLS Block 2 shroud is nearly complete. Architecture B 9.2 meter that uses an existing fairing size will begin study this Fall. This talk will summarize the ultra-stable architecture of the 15m segmented telescope including the basic requirements, the basic rationale for the architecture, the technologies employed, and the expected performance. This work builds on several dynamics and thermal studies performed for ATLAST segmented telescope configurations. The most important new element was an approach to actively control segments for segment to segment motions which will be discussed later.

Telescope↗

Ultra-Stable Segmented Telescope Sensing and Control Architecture

The LUVOIR team is conducting two full architecture studies. Architecture A - 15 meter telescope that folds up in an 8.4m SLS Block 2 shroud is nearly complete. Architecture B - 9.2 meter that uses an existing fairing size will begin study this Fall. This talk will summarize the ultra-stable architecture of the 15m segmented telescope including the basic requirements, the basic rationale for the architecture, the technologies employed, and the expected performance. This work builds on several dynamics and thermal studies performed for ATLAST segmented telescope configurations. The most important new element was an approach to actively control segments for segment to segment motions which will be discussed later.

Telescope↗

The Atacama Cosmology Telescope: The Polarization-Sensitive ACTPol Instrument

The Atacama Cosmology Telescope (ACT) makes high angular resolution measurements of anisotropies in the Cosmic Microwave Background (CMB) at millimeter wavelengths. We describe ACTPol, an upgraded receiver for ACT, which uses feedhorn-coupled, polarization-sensitive detector arrays, a 3deg field of view, 100 mK cryogenics with continuous cooling, and meta material antireflection coatings. ACTPol comprises three arrays with separate cryogenic optics: two arrays at a central frequency of 148 GHz and one array operating simultaneously at both 97 GHz and 148 GHz. The combined instrument sensitivity, angular resolution, and sky coverage are optimized for measuring angular power spectra, clusters via the thermal Sunyaev-Zel'dovich (SZ) and kinetic SZ signals, and CMB lensing due to large-scale structure. The receiver was commissioned with its first 148 GHz array in 2013, observed with both 148 GHz arrays in 2014, and has recently completed its first full season of operations with the full suite of three arrays. This paper provides an overview of the design and initial performance of the receiver and related systems.

Telescope↗