Search NASASearch

NASA NTRS · 20260001810

Design, Development, and Test of the Advanced Apollo Orbital Assembly System

Abstract

As spaceflight moves toward commercial solutions for Crew Vehicles and Space Stations, opportunity exists to lower costs with novel designs. Probe and cone docking systems provide a lightweight, low cost, and high-performance docking solution. This work revisits the Apollo probe and cone design and modifies it for the requirements of today’s computer-controlled spacecraft. This new system is called the Advanced Apollo Orbital Assembly (APOA) system, and is intended to support satellite, cargo, and space station assembly missions. A simulation of the APOA was programmed, components were sized, and a design was created by scaling the probe to the size of an EELV Secondary Payload Adapter (ESPA) tunnel. Prototype test hardware was 3D printed using Fused Deposition Modeling (FDM) methods with Polylactic Acid (PLA) material. Testing of the APOA-ESPA was conducted at Marshall Space Flight Center’s (MSFC) Flat Floor, and a test-correlated simulation is used to evaluate a Monte-Carlo of Initial Contact Conditions (ICC’s) to establish baseline performance. The successful development, test, and correlation of the APOA-ESPA proves the design validity and increases Technology Readiness Level (TRL) from 2 to 4. This work opens the door to construction of an APOA-ESPA from flight like materials, and to develop a larger scale prototype APOA. When the full scale APOA is incorporated with the Common Berthing Mechanism (CBM), becomes the Hybrid Berthing System (HBS), which allows for berthing without a robotic arm.

Explore related subjects

Keep this discovery

BibTeXRIS

Marc Jarmulowicz, Aaron Miller. Design, Development, and Test of the Advanced Apollo Orbital Assembly System. https://ntrs.nasa.gov/citations/20260001810

Cite the original work for its findings. Save a collection to share your selection of sources.

Discover connections

Connections use source metadata and explicit phrase matches, not verified experimental comparisons.

KEEP EXPLORING

Related reports

2005 NASA Seal/Secondary Air System Workshop

The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA’s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn’s seal project aimed at developing advanced seals for NASA’s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary “androgynous” seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

Hypersonic

Manned Lunar Landing Via Rendezvous

In any mission description, the vehicles, the flight profiles, and the astrionics hardware to im- plement the mission are all tightly interwoven things. A final result evolves only after many iterations to the solution are made. This paper will describe one of these iterations in the Saturn C-5 Earth Orbit Rendezvous approach to the Manned Lunar Landing Program. Since the iter- ation to be described in an nthone, there exists some basis for the hope that the perturbation from the final solution is small. This paper is not concerned with the landing itself, but only with those operations leading to injection of the space craft into the lunar trans- fer trajectory. However, as is to be expected, it is the target conditions which set the pace for the overall operation. The entire operation must be sized to culminate at a time and place which places the lunar target in an attainable position. The procedure would call for a burst of activity lasting over a relatively short time as compared to the long and extensive preparations leading up to it. The activity must be aimed at the opening of the lunar "launch window". Figure 1 illustrates the variation in the velocity increment required to launch a vehicle into a lunar transfer trajectory from a 485 kilometer earth orbit. The minima are at irregularly spaced intervals and are a func- tion of the inclination of the lunar and the earth satellite planes and of the position of the moon in its orbit around the earth (i. e. , the day of the month). In an operations analysis these spacings will influence the number of vehicles on the launch pad (primary and back-up) , their state of readi- ness, the firing rate, and also the flight profile to be chosen. Whether it is decided to go by "con- necting" or by "tanking" mode, the objective must be to get the spacecraft in the launch ready state at the opening of one of these launch windows. It may be desired that the first vehicle be capable of remaining in a functionally capable state even after bridging one or more of the gaps between the windows. This consideration will influence the design of the vehicles as well as the operational modes to be designed into the flight control hard- ware. For example, a sleep switch may be de- sirable from the standpoint of savings in battery we ight.

LUNAR LANDING