Search NASASearch

NASA NTRS · 20260005928

Harness Thermal Heat Loss Measurement for A Lunar Surface-Deployed LEMS Artemis III Payload

Abstract

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.

Explore related subjects

Keep this discovery

BibTeXRIS

Juan Rodriguez-Ruiz, Ethan Burbridge, Brian Langbein, Elliot Schwartz. Harness Thermal Heat Loss Measurement for A Lunar Surface-Deployed LEMS Artemis III Payload. https://ntrs.nasa.gov/citations/20260005928

Cite the original work for its findings. Save a collection to share your selection of sources.

Discover connections

Connections use source metadata and explicit phrase matches, not verified experimental comparisons.

KEEP EXPLORING

Related discoveries

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

TVAC

Developmental and Cryogenic Thermal Vacuum (TVAC) Testing Lessons Learned

Developmental thermal vacuum (TVAC) testing is a critical step in maturing hardware designs and validating performance prior to flight qualification. Unlike qualification or acceptance testing, developmental testing provides flexibility to explore design margins, uncover integration challenges, and refine test approaches before formal verification activities begin. This presentation highlights the value of developmental testing while sharing common pitfalls encountered during developmental TVAC campaigns. Lessons learned from hands-on testing experience, including extensive developmental testing at cryogenic temperatures, will be shared in this presentation. Topics include test planning and preparation, instrumentation strategies, contamination control considerations, troubleshooting unexpected anomalies, and approaches for staying on schedule while meeting test objectives. The audience will gain practical insights and best practices that can improve test efficiency, reduce risk, and enhance the overall success of future developmental TVAC efforts.

Mackenzie Byrnes

QS ATMS Calibration Data Book Government Version: Pre-Launch Version

The Advanced Technology Microwave Sounder (ATMS) SN301 is an instrument onboard the QuickSounder Satellite System, QuickSounder mission (renamed QS). Throughout this document the mission may be referred to as QuickSounder or QS. The purpose of this document is to provide information needed to interpret and process QS ATMS science data. The contents of the data book incorporate results from pre-launch subsystem-level and instrument-level testing as well as post-launch testing performed during instrument commissioning. Major milestones include instrument thermal vacuum (TVAC) testing in May 2024 and observatory TVAC testing in 2026. QS launch will be no earlier than Feb. 15, 2027.

Microwave Radiometer