Search NASASearch

NASA NTRS · 20260006693

Adaptive Curation at NASA Johnson Space Center: Preparing for Artemis Samples by Leveraging Proven Practices and Innovative Solution

Abstract

The proper curation of returned astromaterial samples is essential to ensure that high-quality scientific investigations can be conducted for decades, enabling future generations to address evolving research questions. The Astromaterials Acquisition and Curation Office at NASA Johnson Space Center (hereafter JSC Curation) is responsible for curating all of NASA’s extraterrestrial samples. Under the governing document, NASA Procedural Requirement (NPR) 7100.5 “Curation of Extraterrestrial Materials”, JSC Curation is charged with “The curation of all extraterrestrial material under NASA control, including future NASA missions.” The Directive goes on to define Curation as including “...documentation, preservation, preparation, and distribution of samples for research, education, and public outreach.” JSC Curation has a long-standing legacy of curating extraterrestrial materials, including but not limited to Apollo and Luna lunar samples, Genesis solar wind samples, Stardust comet samples, asteroid samples (Hayabusa1, Hayabusa2, and OSIRIS-REx), and Antarctic Meteorite samples from a variety of parent bodies. Building on this foundation, the Artemis program introduces new challenges and opportunities for sample curation, requiring both the application of proven practices and the development of innovative solutions. The Artemis Collection will be curated using established protocols refined through decades of experience with Apollo and subsequent sample collections, including but not limited to the utilization of cleanrooms, custom nitrogen gloveboxes, specialized storage containers and tools; all of which have strict material utilization and prohibition requirements. These practices provide a robust framework for contamination control, documentation, and long-term preservation. However, Artemis samples may present unique scientific and operational requirements, including enhanced contamination control measures (relative to Apollo) driven by evolving science objectives. To meet these needs, JSC Curation is actively developing new technologies and protocols that extend beyond traditional approaches, ensuring that the integrity of samples is maintained under increasingly stringent standards. One critical area of innovation is the development of cold sample curation capabilities. Certain Artemis samples, particularly those from Permanently Shadowed Regions (PSRs) and cold environments, are expected to contain ices and volatile components that require preservation and handling at sub-zero or even cryogenic temperatures. JSC Curation is leveraging best practices from the cold and cryogenic sample industries, as well as other government agencies and academic experts, to design facilities and handling procedures that maintain sample integrity while enabling scientific access. The goal is to develop capabilities to allow researchers to investigate volatiles and other temperature-sensitive materials while minimizing chemical and physical alterations from their returned state. In summary, adaptive curation at JSC combines the reliability of proven methodologies with forward-looking innovations to meet the scientific and operational demands of Artemis. Through enhanced contamination control, advanced cold curation capabilities, and an understanding of known and evolving future science priorities, NASA is preparing to maximize the scientific return from Artemis samples and preserve their value for generations of researchers.

Keep this discovery

BibTeXRIS

Andrea D Harrington, Juliane Gross, Michael C Huh, Ryan A Zeigler, Alissa Madera, Jemma Davidson. 2026-08-01. Adaptive Curation at NASA Johnson Space Center: Preparing for Artemis Samples by Leveraging Proven Practices and Innovative Solution. https://ntrs.nasa.gov/citations/20260006693

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related discoveries

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

NASA. Johnson Space Center primary battery applications

The role of the Power Branch/EP5 of JSC in primary battery applications is to support those JSC organizations having direct application responsibility with trade studies, battery selection recommendations, and with development, qualification, and provisioning of primary batteries. Battery subsystem management is provided. Payload hazard report preparation is supported, as is the review and comment of such reports for the JSC Payload Safety Panel, who approves the flight safety for all Orbiter payloads. JSC battery users are provided with safety analysis and test support to achieve safety approval. Finally, it is the responsibility of the Power Branch to define and maintain battery safety requirement documentation for JSC.

Bragg, Bob J.