The Orion spacecraft has recently completed Artemis II, the first crewed mission around the moon in 54 years. This test flight demonstrated vehicle capability as the foundation for all future missions under the Artemis program. As a major system of Orion, the Active Thermal Control System (ATCS) successfully managed crew and vehicle heat loads to provide adequate cooling and thermal comfort for the duration of the Artemis II mission. Thermal control on the Orion vehicle is managed through two redundant cooling loops in the Crew Module (CM) that absorb heat loads from the cabin and Air Revitalization System (ARS) heat exchangers, the Liquid Cooling Garment (LCG) heat exchanger, and the avionics cold plates, and then transfer those heat loads to the Service Module (SM) radiator loops and/or the Phase Change Material (PCM) and ammonia boilers when required through thermal configuration or mission phase. During Artemis II, Orion did not necessitate any supplemental cooling from ammonia boilers until service module separation, allowing the maximum availability of ammonia cooling prior to entry. This presentation will provide an overview of the Orion ATCS major subsystems, highlight the performance during key mission phases, and comment on the applicability of the observed thermal response to future Artemis missions.

Keep this discovery

BibTeXRIS

Ellie Thurston, Michael Johnston, Thomas Chen, Eddie Uribe, Dongeun Lee, John Whitmore, Johnathan Hernandez, Maddie Haas, Matthew Gietzel, Ian Anchondo. Artemis II Mission Performance of the Orion Active Thermal Control System. https://ntrs.nasa.gov/citations/20260007602

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related discoveries

Under Pressure: The Artemis I Heatshield Char Loss Investigation and Artemis II’s Successful Entry

Following the successful Artemis I skip reentry on December 11, 2022, unexpected char liberation from the Orion heat- shield prompted formation of an Anomaly Response Team to determine root cause and establish flight rationale and corrective actions for subsequent missions. Through a comprehensive investigation including detailed hardware analysis, modeling & simulation, and ground testing, the team determined that the low permeability Avcoat experienced extreme internal gas pressure buildup during the skip entry that could not adequately outgas, leading to crack formation and char liberation. Key discoveries included significant performance differences between permeable and impermeable heatshield regions and successful replication of the anomaly through ground testing. Based on extensive ground testing and analysis, Artemis II flew a modified trajectory without the skip entry to minimize crack-inducing conditions, and successfully splashed down on April 10, 2026 with significantly reduced char loss. For Artemis III and beyond, a corrective action was implemented to produce a more permeable version of Avcoat that will substantially reduce internal pressure accumulation during entry.

Artemis II

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins