DOE OSTI · 1034063
Beam Loading Computation for the IDS-NF FFAG
Abstract
I accumulate the information we have for the current baseline design for a neutrino factory to determine the maximum current we can expect at the final FFAG accelerating stage. I then determine the energy extracted from the RF cavities in the FFAG, and from that determine how much time there must be between bunch trains to restore the energy to the RF cavities so that each bunch train has the same energy at the storage ring. I also estimate the amount of energy variation from the head to the tail of the bunch train.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Berg, J. Scott. 2011-10-01. Beam Loading Computation for the IDS-NF FFAG. https://doi.org/10.2172/1034063
Cite the original work for its findings. Save a collection to share your selection of sources.