Progress Update: Stack Project Complete

Abstract

Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Cody, Tom. 2010-01-01. Progress Update: Stack Project Complete. https://www.osti.gov/biblio/1042603

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗