Search NASA⌕ Search

DOE OSTI · 1051437

Section III, Division 5 - Development And Future Directions

Abstract

This paper provides commentary on a new division under Section III of the ASME Boiler and Pressure Vessel (BPV) Code. This new Division 5 has an issuance date of November 1, 2011 and is part of the 2011 Addenda to the 2010 Edition of the BPV Code. The new Division covers the rules for the design, fabrication, inspection and testing of components for high temperature nuclear reactors. Information is provided on the scope and need for Division 5, the structure of Division 5, where the rules originated, the various changes made in finalizing Division 5, and the future near-term and long-term expectations for Division 5 development.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Morton, Dana K., Jetter, Robert I, Nestell, James E., Burchell, Timothy D, Sham, Sam. 2012-01-01. Section III, Division 5 - Development And Future Directions. https://www.osti.gov/biblio/1051437

Cite the original work for its findings. Save a collection to share your selection of sources.