Abstract
This report provides documentation of the overarching architecture for the Strategic Contractor Planning Tool and framework. The report describes the system organization, high-level system structure, and interfaces. Various architectural views provide descriptions of the planning tool architecture, information flow, and functionality. The information flow serves to tie together the architecture, analytic framework and existing capabilities. This report highlights the potential integration points for the planning tool within the existing OSD and DoD strategic planning activities. Many existing tools, policies, and information can be leveraged as inputs to this planning tool, including strategic planning information, personnel, and cost resources. These resources are listed and discussed. A high-level description of the planning tool functionality and usage are also described.
Keep this discovery
Explore connections, maps & timelines
Miner, Nadine E., Nanco, Alan Stewart, Adair, Kristin L., Bandlow, Alisa, Jones, Dean A., Jones, Katherine A., Martin, Nathaniel, Nozick, Linda Karen. 2012-06-01. Contingency contractor optimization. Phase 2, architecture document. https://doi.org/10.2172/1055589
Cite the original work for its findings. Save a collection to share your selection of sources.