DOE OSTI · 1063926
Shavano Infrastructure Upgrade Study
Abstract
At the beginning of FY10 I was given the task of investigating possible options for upgrading the Shavano backplane code, and forming a plan for implementing upgrades beginning in FY11. The following pages document the results of my investigation. The major task done for this activity was a feasibility study for converting the entire Shavano code base to C++. This study is documented briefly in the next section. In addition, several other upgrade possibilities are listed, and a proposed plan for FY11 work is presented.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Ferenbaugh, Charles R.. 2010-09-30. Shavano Infrastructure Upgrade Study. https://doi.org/10.2172/1063926
Cite the original work for its findings. Save a collection to share your selection of sources.