Search NASA⌕ Search

DOE OSTI · 1166881

Sub-Second Parallel State Estimation

Abstract

This report describes the performance of Pacific Northwest National Laboratory (PNNL) sub-second parallel state estimation (PSE) tool using the utility data from the Bonneville Power Administrative (BPA) and discusses the benefits of the fast computational speed for power system applications. The test data were provided by BPA. They are two-days’ worth of hourly snapshots that include power system data and measurement sets in a commercial tool format. These data are extracted out from the commercial tool box and fed into the PSE tool. With the help of advanced solvers, the PSE tool is able to solve each BPA hourly state estimation problem within one second, which is more than 10 times faster than today’s commercial tool. This improved computational performance can help increase the reliability value of state estimation in many aspects: (1) the shorter the time required for execution of state estimation, the more time remains for operators to take appropriate actions, and/or to apply automatic or manual corrective control actions. This increases the chances of arresting or mitigating the impact of cascading failures; (2) the SE can be executed multiple times within time allowance. Therefore, the robustness of SE can be enhanced by repeating the execution of the SE with adaptive adjustments, including removing bad data and/or adjusting different initial conditions to compute a better estimate within the same time as a traditional state estimator’s single estimate. There are other benefits with the sub-second SE, such as that the PSE results can potentially be used in local and/or wide-area automatic corrective control actions that are currently dependent on raw measurements to minimize the impact of bad measurements, and provides opportunities to enhance the power grid reliability and efficiency. PSE also can enable other advanced tools that rely on SE outputs and could be used to further improve operators’ actions and automated controls to mitigate effects of severe events on the grid. The power grid continues to grow and the number of measurements is increasing at an accelerated rate due to the variety of smart grid devices being introduced. A parallel state estimation implementation will have better performance than traditional, sequential state estimation by utilizing the power of high performance computing (HPC). This increased performance positions parallel state estimators as valuable tools for operating the increasingly more complex power grid.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Chen, Yousu, Rice, Mark J., Glaesemann, Kurt R., Wang, Shaobu, Huang, Zhenyu. 2014-10-31. Sub-Second Parallel State Estimation. https://doi.org/10.2172/1166881

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗