Search NASA⌕ Search

DOE OSTI · 1223175

HPC - Facilities Penta

Abstract

Strategy, Planning, Acquiring- very large scale computing require very large physical infrastructures, pipes, pumps, power, etc. Planning and acquiring $25M+ infrastructure projects and bringing in more power to the county takes a lot of long lead time / planning. Integration- New physical infrastructure must be integrated into our buildings, with the LANL site power and water systems, with existing infrastructure, and with the machines. Very large physical infrastructure projects are necessary. Management and Utilization – Ongoing operations, monitoring, maintenance, and trouble shooting of the physical infrastructure is required.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Trujillo, Angelina Michelle. 2015-10-08. HPC - Facilities Penta. https://doi.org/10.2172/1223175

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports