DOE OSTI · 1223175
HPC - Facilities Penta
Abstract
Strategy, Planning, Acquiring- very large scale computing require very large physical infrastructures, pipes, pumps, power, etc. Planning and acquiring $25M+ infrastructure projects and bringing in more power to the county takes a lot of long lead time / planning. Integration- New physical infrastructure must be integrated into our buildings, with the LANL site power and water systems, with existing infrastructure, and with the machines. Very large physical infrastructure projects are necessary. Management and Utilization – Ongoing operations, monitoring, maintenance, and trouble shooting of the physical infrastructure is required.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Trujillo, Angelina Michelle. 2015-10-08. HPC - Facilities Penta. https://doi.org/10.2172/1223175
Cite the original work for its findings. Save a collection to share your selection of sources.