Search NASA⌕ Search

DOE OSTI · 1223181

Facility target insert shielding assessment

Abstract

Main objective of this report is to assess the basic shielding requirements for the vertical target insert and retrieval port. We used the baseline design for the vertical target insert in our calculations. The insert sits in the 12”-diameter cylindrical shaft extending from the service alley in the top floor of the facility all the way down to the target location. The target retrieval mechanism is a long rod with the target assembly attached and running the entire length of the vertical shaft. The insert also houses the helium cooling supply and return lines each with 2” diameter. In the present study we focused on calculating the neutron and photon dose rate fields on top of the target insert/retrieval mechanism in the service alley. Additionally, we studied a few prototypical configurations of the shielding layers in the vertical insert as well as on the top.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Mocko, Michal. 2015-10-06. Facility target insert shielding assessment. https://doi.org/10.2172/1223181

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports