Search NASA⌕ Search

DOE OSTI · 1605572

LBNF CMGC Delivery Method: ICE Process

Abstract

The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Pelletier, Douglas, Thompson, Andy, DiFore, Ben, Wallace, Jeff F.. 2020-03-19. LBNF CMGC Delivery Method: ICE Process. https://www.osti.gov/biblio/1605572

Cite the original work for its findings. Save a collection to share your selection of sources.