DOE OSTI · 1607875
High Temperature, High AN2 Last Stage Blade for 65% Efficiency Phase I (Final Report)
Abstract
GE Power (GEP), in partnership with GE Global Research (GEGR)(GEP and GEGR are divisions of General Electric Company) developed hot and large Last Stage Blade (LSB) technologies necessary for state-of-the art gas turbines to successfully realize ~3100°F turbine inlet temperatures (TIT), an essential element to reaching the DOE goal of 65% combined cycle efficiency (CCeff). The objective of this project was to develop conceptual LSB designs and advance the technological understanding of synchronous vibrations (SV), nonsynchronous vibrations (NSV), and damping that limit the current state-of-the-art LSB designs and applications. In the Phase I project GE Power leveraged existing design and analysis knowledge and techniques for LSB design and performed extensive analytical evaluations to identify and characterize conceptual design concepts.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Delvaux, John. 2020-04-01. High Temperature, High AN2 Last Stage Blade for 65% Efficiency Phase I (Final Report). https://doi.org/10.2172/1607875
Cite the original work for its findings. Save a collection to share your selection of sources.