Search NASA⌕ Search

DOE OSTI · 1618201

Site 200 #1400 Block Area New Trailers Project, Soil Sampling and Analysis Plan/Quality Assurance Plan

Abstract

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is proposing to install a series of modular trailers and install associated underground utilities in the 1400 Block at the Livermore Site. This Sampling and Analysis Plan (SAP) outlines the processes and procedures to collect environmental and geotechnical soil samples from the project area and to send the samples to the appropriate laboratory or laboratories for analysis or testing. The resulting environmental laboratory data will determine whether excavated soils can be reused on the project, or which type of landfill or landfills the soils may be sent for disposal. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2019), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives programs (EPA, 2006).

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Bergeron, B. P.. 2020-05-07. Site 200 #1400 Block Area New Trailers Project, Soil Sampling and Analysis Plan/Quality Assurance Plan. https://doi.org/10.2172/1618201

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Water4Energy Step-1 Band-M Ready-to-Train Samples for TVA Weeks-to-Years Prediction, Version 0

AI-ready Band-M (monthly) labelled training pack for the Water4Energy Genesis Task-1 project on weeks-to-years prediction of Tennessee Valley temperature and precipitation. The deposit includes leakage-aware issue-time samples (samples_M_v0.nc; N=486), train-only scalers, issue-time split table, supporting monthly panels, and Python generation scripts to recreate the pack from the companion Tier-1 raw observation collection (https://doi.org/10.13139/ORNLNCCS/3398576). Each sample pairs a 12-month lookback of teleconnection indices and SST box anomalies with TVA-mean ERA5 anomaly targets (t2m, tp, msl) at leads 1–3 months.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, particle analysis

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, time bins

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗