DOE OSTI · 1618313
WNR Facility FP90L Visual Inspection Report
Abstract
An external and internal visual inspection of FP90L was performed March 2020. This report presents the results from this visual inspection, detailing individual components and their relative location along FP90L within the WNR facility bulk shield. This report will present the data gathered from this visual inspection. Then, utilizing available facility drawings as well as LIDAR data from surveys performed in the spring/summer of 2019, this inspection data will be merged with previous efforts and studies regarding the WNR facility to document a more complete representation of the current state of WNR FP90L.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
DiGiovine, Brad Joseph, Ballard, David Joseph. 2020-03-27. WNR Facility FP90L Visual Inspection Report. https://doi.org/10.2172/1618313