Stochastic Optimization for Grid Resilience. FY18 Final Technical Report

Abstract

The optimal restoration problem lies at the foundation of the evaluation and improvement of resilience in power systems. In this report we present a scalable decomposition algorithm for solving this problem for realistic power systems. The algorithm has been developed in three major research threads, corresponding to the chapters in the present report. Chapter 1 studies mixed-integer programming (MIP) formulations for the requirement that each electrical island that appears after a recon guration must have at least one energized generator. We provide three alternative MIP formulations for this restriction, show their equivalence, and prove that two of them are stronger in terms of their linear programming relaxation than the formulation most commonly used in the power systems literature. Since the time to solve MIPs can vary signi cantly between equivalent formulations, we also present computational experiments on IEEE test systems for the Intentional Controlled Islanding (ICI) and the Black Start Allocation (BSA) problems. We observe that a polynomially separable, exponential in size, strong formulation yields the best performance for the BSA problem and exhibits a comparable performance to a linear in size, weak formulation for the ICI problem. Chapter 2 presents a methodology to generate mixed-integer linear approximations of the AC power ow equations governing lines, transformers (including tap regulators and phase shifters), shunt and series compensators, and consumption responsive to voltage. Our approximations are capable of capturing limitations for power grids under abnormal or uncommon operating conditions where common assumptions used in power ow relaxations may not hold. Particularly, the approximation captures overvoltages under almost no load, which is a major concern when energizing lines after a blackout. The method constructs piecewise linear approximations of the non-linear power ow equations by minimizing the squared approximation error over a subset of the feasible domain. We test the method using a realistic database for the Chilean system (1548 buses, 1114 lines, 564 transformers). The resulting approximations yield root mean square errors in the order of 0.05pu and are successfully applied to solve a transmission switching instance for the Chilean system. Chapter 3 presents our algorithm for optimal restoration. The algorithm works by partitioning the problem into a master problem and a slave problem. The master problem optimizes over energization sequences of generators, buses and branches, for the entire restoration horizon, while respecting the energization requiments studied in Chapter 1. The slave problem veri es that there exist power ow solutions supporting the energization sequences proposed by the master problem, adding cuts to the master if an infeasible sequence is detected.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Aravena, I., Rajan, D., Patsakis, G., Oren, S., Rios, J.. 2019-05-03. Stochastic Optimization for Grid Resilience. FY18 Final Technical Report. https://doi.org/10.2172/1635780. https://searchnasa.com/record/osti%3A1635780/stochastic-optimization-for-grid-resilience-fy18-final-technical-report

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗