Financing Microgrids in the Federal Sector

Abstract

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kurnik, Chuck, Voss, Phil. 2020-08-01. Financing Microgrids in the Federal Sector. https://doi.org/10.2172/1646983

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗