DOE OSTI · 1648683
IDC Re-engineering Phase 2 (RP2): Analysis Interface Improvements.
Abstract
Abstract not provided.
Keep this discovery
Explore connections, maps & timelines
Burns, John F., Carr, Dorthe B., Coram, Jamie L., Harris, James M., Le Bras, R., Mialle, P., Peiszer, E., Tomuta, E., Young, Christopher J.. 2017-05-01. IDC Re-engineering Phase 2 (RP2): Analysis Interface Improvements.. https://www.osti.gov/biblio/1648683
Cite the original work for its findings. Save a collection to share your selection of sources.