Abstract

The Integrated Distribution Management System (IDMS) project was initiated to demonstrate the interactive operation of microgrid systems and the distribution systems with which they interconnect. The key technologies for this are the microgrid management system and the utility distribution management system. The IDMS project successfully demonstrated that a utility’s advanced distribution management system/distributed energy resources management system (ADMS/DERMS) could effectively manage microgrids to provide visibility and control functionalities as well as use the microgrid as a dispatchable resource to support the utility grid. The DERMS accomplishes this by determining active and reactive power needs at the point of common coupling (PCC) using advanced applications like volt/VAR watt optimization (VVWO) and load relief (LR) with the underlying core applications state estimation (SE) and load flow (LF). The ADMS/DERMS can use the microgrid as a resource to resolve and prevent violations in the grid and to optimize the operational working state of the grid. The IDMS project demonstrated that a utility-operated ADMS with embedded DERMS functionality can flexibly manage a variety of microgrids and other aggregated distributed energy resources (DER) in concert with the wider distribution grid. Microgrids can provide grid services in any number of different ways to meet the operational needs of the distribution utility. The manner of aggregation — microgrid or virtual power plant — is not necessarily relevant to the utility as long as the grid services from the aggregated DER are available and can be managed by its ADMS/DERMS for the stability and reliability of the grid. The IDMS project demonstrated this integrated ADMS concept by combining hardware/software-in-the-loop testing with commercial products from different vendors and a utility’s network model. The project integrated the Schneider Electric EcoStruxure™ ADMS with DERMS with the Schweitzer Engineering Laboratories (SEL) POWERMAX ® Microgrid Control System, and the simulated resources with energy company PECO’s model of a utility-owned microgrid, establishing an operational relationship in which the utility manages the operational functionality of a microgrid at the PCC and that provides the utility with the capability to control the comprehensive power system, inclusive of the macrogrid and microgrid.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Singh, Ravindra, Reilly, Jim, Phan, Albert, Stein, Eric, Kotur, Dimitrije, Petrovic, Mladen, Allen, Will, Smith, Monica. 2020-09-01. Microgrid Energy Management System Integration with Advanced Distribution Management System. https://doi.org/10.2172/1706120

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗