Development of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

Abstract

The concept of an Integrated Energy System (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. A new RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization (HERON) has been developed for optimizing the production variables of the IES given the demand profile. Currently, only the limits that affect the production variables and their corresponding time rates of change are considered (explicit constraints). However, other variables are additionally subject to constraints, but the associated limits are not accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response effects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. The Reference Governor (RG) algorithm is traditionally used for enforcing state and control constraints by modifying the set-point trajectories supplied to the feedback regulators. In our application, the RG is coupled within an iterative loop with the HERON-power dispatcher to generate optimal trajectories that ensure the operational constraints are met. A data-driven procedure to derive a representation of the dynamics of the controlled system was developed. First, the variables that represented the state of the system are selected (PCA-based approach), and then state-space representation matrices are derived from the collected measurements (DMDc algorithm). A preliminary version of the developed workflow based on Linear Time Invariant matrices was assessed by adopting a two-unit test case. More sophisticated versions of this workflow foreseeing the on-line derivation of system matrices will be deployed in FY 2021. Finally, a “plug-and-play” library of controllers and state observers was developed in Dymola. Some aspects of the current configuration of the IES unit components, e.g., the encapsulation of the control schemes into dedicated blocks, are consistent with the “plug-and-play” philosophy. Other features, e.g., the system buses collecting the input and the output variables, are not. For this reason, once listed and described the limits of the current configuration, necessary modifications to the plant model interface are presented. As a test-case, the interfaces of the SES model in the RAVEN-based HYBRID framework were reworked accordingly, and two different control schemes were applied to the same plant model.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Wang, Haoyu, Ponciroli, Roberto, Vilim, Richard B., Alfonsi, Andrea. 2020-09-30. Development of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment. https://doi.org/10.2172/1721623

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗