DOE OSTI · 1755880
WNR Facility T4GEN2 Spallation Target Upgrade
Abstract
In July 2020, a second generation (GEN2) spallation target was installed at the Weapons Neutron Research (WNR) facility. This new spallation was installed in place of a traditional target 4 (T4) spallation target at the facility. The need for this upgrade, design of this GEN2 spallation target, metrology workflow, and results of the effort will be detailed.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
DiGiovine, Brad Joseph. 2020-12-23. WNR Facility T4GEN2 Spallation Target Upgrade. https://doi.org/10.2172/1755880
Cite the original work for its findings. Save a collection to share your selection of sources.