DOE OSTI · 1774390
2019 Megasun Illumination System. Modifications and Operating Procedure Updates [Slides]
Abstract
The original operating procedure was nearly 20 years old, though it was on a semi-annual review schedule. Some electrical categories had changed, as well as their risk management assessments. The IWD did not reflect these updated guidelines. No injuries have been reported during nearly 20 years of operation (not a bad record), however, several abnormal conditions came to surface during our Hazard Analysis conversations. One of which included an oil based capacitor malfunction which cracked it’s housing and leaked oil within the 2001 system. Our training and qualifications were updated to reflect LANL’s current standards.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Esquibel, Brian David. 2021-03-30. 2019 Megasun Illumination System. Modifications and Operating Procedure Updates [Slides]. https://doi.org/10.2172/1774390
Cite the original work for its findings. Save a collection to share your selection of sources.