Building information modeling (BIM) has been widely adopted for representing and exchanging building data across disciplines during building design and construction. However, BIM's use in the building operation phase is limited. With the increasing deployment of low-cost sensors and meters, as well as affordable digital storage and computing technologies, growing volumes of data have been collected from buildings, their energy services systems, and occupants. Such data are crucial to help decision makers understand what, how, and when energy is consumed in buildings—a critical step to improving building performance for energy efficiency, demand flexibility, and resilience. However, practical analyses and use of the collected data are very limited due to various reasons, including poor data quality, ad-hoc representation of data, and lack of data science skills. To unlock value from building data, there is a strong need for a toolchain to curate and represent building information and performance data in common standardized terminologies and schemas, to enable interoperability between tools and applications. This study selected and reviewed 24 data tools based on common use cases of data across the building life cycle, from design to construction, commissioning, operation, and retrofits. The selected data tools are grouped into three categories: (1) data dictionary or terminology, (2) data ontology and schemas, and (3) data platforms. The data are grouped into ten typologies covering most types of data collected in buildings. This study resulted in five main findings: (1) most data representation tools can represent their intended data typologies well, such as Green Button for smart meter data and Brick schema for metadata of sensors in buildings and HVAC systems, but none of the tools cover all ten types of data; (2) there is a need for data schemas to represent the basis of design data and metadata of occupant data; (3) standard terminologies such as those defined in BEDES are only adopted in a few data tools; (4) integrating data across various stages in the building life cycle remains a challenge; and (5) most data tools were developed and maintained by different parties for different purposes, their flexibility and interoperability can be improved to support broader use cases. Finally, recommendations for future research on building data tools are provided for the data and buildings community based on the FAIR principles to make data Findable, Accessible, Interoperable, and Reusable.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Luo, Na, Pritoni, Marco, Hong, Tianzhen. 2021-05-23. An overview of data tools for representing and managing building information and performance data. https://doi.org/10.1016/j.rser.2021.111224

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.