Search NASA⌕ Search

DOE OSTI · 1818878

Transportation Hub Infrastructure Expansion: Decision Support Under Uncertainty

Abstract

The Athena project (www.athena-mobility.org) has worked to investigate the relationship between the Dallas-Fort Worth Airport (DFW) and the greater Dallas area in order to better understand and therefore better inform future decision-making regarding the critical infrastructure that influence mobility between the airport and the city. Through this work, infrastructure related to curbside pickup and drop-off, parking, public transit, and the road network congestion were identified as critical to the operation of the DFW transportation hub. The infrastructure analysis and expansion aspect of the Athena project is focused on the restructuring of the CTA curb as a hierarchical curb and the building or repurposing of parking infrastructure as the interplay between these two areas. Many sources of uncertainty exist that may impact future airport and transportation hub operations, such as passenger volume growth, population demographic changes over time, electric vehicle (EV) adoption rates, and autonomous vehicle (AV) adoption rates. Due to these sources of uncertainty, we have selected for our research a modeling framework that can capture various types of uncertainty and hedge against those uncertainties in the optimization process. We analyze road network and curb congestion, the rise of transportation networking companies, trends in parking usage, existing policies around this infrastructure, airport revenue streams, and other contributing factors to enable infrastructure decision making with less uncertainty. To accomplish this wholistic analysis, we have developed a novel multi-stage, multi-period stochastic optimization model which considers the airport's decisions from 2025-2045 under different possible future macro trajectories and day-to-day variations in operational conditions captured as "annual representation of operations" scenarios with respective probabilities. This model has also been designed to leverage the outputs of various efforts under the Athena project to create a combined decision framework for infrastructure decisions. These various efforts include the route optimization model, the ASPIRES simulation, the mode choice model, and the SUMO traffic simulation. Our computational experiments of this system at scale have resulted in a working version of our infrastructure model which enables the explicit representation and consideration of various sources of uncertainty in the decision process to enable robust, flexible decision-making. This model has been effectively run on NREL's HPC system, Eagle, with large numbers of stochastic scenarios and shows promise as a scalable tool for robust consideration of uncertainties in airport planning. We have tested our model using 30,240 operational circumstances in total, resulting in a problem with more 200 million variables. This model was solved in several different configurations, and a workflow to simulate the performance of the infrastructure model results was developed and deployed. In general, our results indicate that a combination of remote parking, remote curb infrastructure, and dynamic pricing can generate revenue, reduce emissions, accommodate emerging technologies such as AVs and EVs, and manage airport passenger growth over time. We note the success of the proposed strategy depends on the data collection and forecasting abilities of DFW. We have also seen that the AV adoption by TNCs might necessitate larger amounts of remote curb. The results of this work inform strategies for airport infrastructure decision making, as well as demonstrate the value of an adaptable model, but also indicate that there are avenues remaining where further research would be of value.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Sigler, Devon, Liu, Zhaocai, Wang, Qichao, Ge, Yanbo, Ugirumurera, Juliette, Severino, Joseph, Biehl, Alex, Xie, Fei, Garikapati, Venu, Lunacek, Monte, Phillips, Caleb. 2021-08-31. Transportation Hub Infrastructure Expansion: Decision Support Under Uncertainty. https://doi.org/10.2172/1818878

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗