Search NASA⌕ Search

DOE OSTI · 1823036

Regal Beloit Final Technical Report

Abstract

The original project proposal submitted from NovaTorque Inc (NovaTorque) in 2016 was to improve the existing motor with 95% efficiency by reducing the losses by 21% to achieve 96%. A few months after the proposal was submitted, NovaTorque lost funding and went out of business. The assets of NovaTorque were then acquired by Regal Beloit Corporation (“Regal Beloit” or “Regal”). When the NovaTorque proposal was selected, the project was transferred to Regal Beloit. Once we had production samples from the new Regal production line, they were tested at the Regal Beloit test lab in Wausau, WI. The original NovaTorque motor had an efficiency of 95%, but when the technology was transferred to Regal Beloit, there were multiple manufacturing improvements made, even though the basic electromagnetic design did not change. The test results in Wausau showed that the motors made at the Regal Beloit plant had an efficiency of 96%. Since the goal of the project was to reduce the losses by 21%, a new efficiency target of 96.8% became the project objective. In the first budget period, motors were tested to get the baseline performance. We then used FEA modeling with ANSYS Maxwell to model the existing motor to get correlation between the FEA simulations and the actual test results. Once the model was validated, we evaluated some changes that could be made to the stator to reduce the losses and improve efficiency without changing the rotor or stator housing, keeping the modifications easy to implement. The changes were primarily in the area of making the stator axially shorter and adding Soft Magnetic Composite (SMC) tooth tips. In the second budget period, we proceeded to design and build the new stator that was identified above and identified additional improvements in the process that included a stator machining modification and the use of rectangular wire. When we actually built the motor, the choice of rectangular wire turned out to be a problem. The wire was made by squishing round wire to get the rectangular shape, which caused work hardening, making the wire too stiff to make the desired coils. We shifted to annealed square wire which was better, but we still could not maintain the proper coil envelope. The result was that we had reduced cross section area for stator laminations. We also had to have a radial offset resulting in a radial misalignment between the stator and rotor because of the oversized coils. After the motor was completed, it was shipped to Texas A&M University for testing. With the loss of flux from these issues, the measured motor efficiency was only 96.3%. The primary focus of this motor was to make sure our FEA simulation model predicted the measured losses and overall efficiency, this we moved on to the FEA simulation. The FEA simulations of the motor “as built” with misalignments had good correlation with the test results, so the next step was to use that model to optimize the design of the motor for a final build. This time we considered changes to the stator and rotor and also minor changes to the housing diameter. In the third budget period, we did the detailed design and construction of the final prototypes. The final prototypes had a slight increase in the stator diameter to fit in a standard Regal Beloit housing. We shortened the stator and use more layers of wire in the coils. We also increased the cone angle of the rotor and stator from the original 110 degrees to 130 degrees to get some additional efficiency and optimized the stator cross section. The predicted efficiency from the FEA simulations was 96.9%. When completed, the motors were tested. We were a little short of reaching our target efficiency goal of 96.8%. We were only able to get to 96.7% efficiency. While it may be possible with additional iterations in designs and future builds to gain that additional 0.1%, we believe that we are close to the best we can achieve from a practical viewpoint, and additional iterations would be more work than the potential gains would be worth. No other motor in this class can even reach the 96% that we started with.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Crapo, Alan, Toliyat, Hamid. 2021-09-27. Regal Beloit Final Technical Report. https://doi.org/10.2172/1823036

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗