Search NASA⌕ Search

DOE OSTI · 1834190

A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex

Abstract

The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam power from the Fermilab Main Injector, over the energy range 60 - 120 GeV, at the start of operation of the LBNF/DUNE program. PIP-II provides a variety of upgrade paths to higher beam power from the Main Injector, as demanded by the neutrino science program and as recommended by the 2014 P5 report. Delivering more than 2 MW to the LBNF target in the future will require a replacement of the existing Booster. This report outlines a cost-effective Booster replacement option and an upgrade path for the Fermilab Accelerator Complex to attain 2.4-MW beam power on the LBNF target, as well as to retain the capability to provide 8-GeV proton beams to the existing Fermilab Muon Campus via the existing Recycler ring. Its cost-effectiveness is achieved by: (1) using a small-diameter metallic vacuum chamber in the Booster replacement and (2) reusing the existing Recycler ring. Reusing the Recycler ring may be of particular advantage since it is presently employed to deliver 8-GeV beams to the Muon Campus experiments. The present concept also retains such a capability.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Nagaitsev, Sergei, Lebedev, Valeri. 2021-11-12. A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex. https://doi.org/10.2172/1834190

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗