Search NASA⌕ Search

DOE OSTI · 1861436

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

Abstract

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kuiper, James A., Ayers, Andrew J., Orr, Andrew B.. 2022-03-29. Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool. https://doi.org/10.2172/1861436

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Designing a Robust MEA-Based Post-Combustion Carbon Capture Process with Capture Rate Guarantees

This work presents an application of the nonlinear two-stage robust optimization solver PyROS to the model-based design and operation of a monoethanolamine scrubbing process for CO<sub>2</sub> capture under epistemic uncertainty. Through this application, risk-averse process designs are successfully obtained for CO<sub>2</sub> capture targets ranging from 90% to over 99%. In particular, the risk-averse solutions for CO<sub>2</sub> capture targets of up to 98% are shown to be only marginally more expensive than their nominally optimal counterparts. Thus, the results demonstrate the utility of recently developed nonlinear robust optimization approaches for the solution of large-scale chemical process models under uncertainty.

20 FOSSIL-FUELED POWER PLANTS↗

Optimal Design and Techno-Economic Analysis of 3D-Printed, Intensified Packings for Absorbers and Strippers in Solvent-Based CO 2 Capture

A potential technology for the CO 2 absorption process is utilizing intensified structured packing with embedded cooling/heating channels for continuous heat exchange, which can overcome limitations of discrete methods, such as discrete intercooling and centralized reboilers, to aid in reducing energy consumption and decreasing costs. This work investigates the modeling of intensified packing (IP) for the stripper tower, extending on previous work for the absorber, which distributes heat internally within the column, improving the thermodynamics for the solvent regeneration process. The model includes submodels for steam turbine extraction to produce steam at various qualities as well as a surrogate model for calculating steam enthalpy. A cost model for a plant-scale absorption capture process was developed, allowing for the design of the plant to be optimized, subject to minimizing capture cost using two different power plant flue gas sources. In this optimization, the placement of IP in both towers is optimized to balance the trade-off between enhanced heat transfer and reduced mass transfer volume. For natural gas combined cycle flue gas, the standard process configuration had a minimum cost of $\$$65.40/tonne CO 2 , and considering IP, the minimum capture cost is reduced to $\$$62.73/tonne, with utilization in the stripper column, which reduces yearly costs by up to $\$$2.67 MM/yr. Cooling the absorber through IP, or intercoolers, was only found to be beneficial at higher capture rates, with IP in both towers having a cost of capture of $\$$68.08/tonne at 99.9% capture, a reduction of $\$$12.64/tonne when using only intercoolers at the same capture rate. When capturing from pulverized-coal power plants, the minimum cost of capture when using IP in both towers is $\$$44.18/tonne (at 97% capture), while the standard configuration with and without intercoolers was $\$$45.69 and $\$$47.22 per tonne, respectively. This results in a reduction in yearly costs of $\$$16.98 MM/yr from the base-case configuration. At this higher CO 2 concentration, cooling in the absorber from the IP becomes extremely beneficial, reducing energy consumption by up to 6%.

20 FOSSIL-FUELED POWER PLANTS↗

Transformational Molecular Layer Deposition Tailor-Made Size-Sieving Sorbents for Post-Combustion CO 2 Capture

This report summarizes the carbon capture research and development conducted by The State University of New York at Buffalo (UB), University of South Carolina (USC), GTI Energy (GTI), and Rensselaer Polytechnic Institute (RPI) for U.S. Department of Energy (DOE) project DE-FE0031730 titled “Transformational Molecular Layer Deposition Tailor-made Size-Sieving Sorbents for Post-Combustion CO 2 capture.” The objective of this project was to develop a transformational molecular layer deposition (MLD) tailor-made size-sieving sorbent integrated with a pressure swing adsorption (PSA) cycle schedule that can be installed in new or retrofitted into existing pulverized coal (PC) power plants for CO 2 capture with a cost of electricity at least 30% lower than a supercritical PC power with CO 2 capture, or approximately $\$$30 per tonne of CO 2 captured, and with it being ready for demonstration by 2030.

20 FOSSIL-FUELED POWER PLANTS↗