Search NASA⌕ Search

DOE OSTI · 1878139

Earned Value Management Systems for Operations Activities

Abstract

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Melamed, Dan, Williams, Crystal, Ramdas, Lisa, Lehman, Rodney. 2022-07-28. Earned Value Management Systems for Operations Activities. https://doi.org/10.2172/1878139. https://searchnasa.com/record/osti%3A1878139/earned-value-management-systems-for-operations-activities

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

TANTE: Time-adaptive operator learning via neural Taylor expansion

Operator learning for time-dependent partial differential equations (PDEs) has seen rapid progress in recent years, enabling efficient approximation of complex spatiotemporal dynamics. However, most existing methods rely on fixed time step sizes during rollout, which limits their ability to adapt to varying temporal complexity and often leads to error accumulation. In this work, we propose the Time-Adaptive Transformer with Neural Taylor Expansion (TANTE), a novel operator-learning framework that produces continuous-time predictions with adaptive step sizes. TANTE predicts future states by performing a Taylor expansion at the current state, where neural networks learn both the higher-order temporal derivatives and the local radius of convergence. This allows the model to dynamically adjust its rollout based on the local behavior of the solution, thereby reducing cumulative error and improving computational efficiency. We demonstrate the effectiveness of TANTE across a wide range of PDE benchmarks, achieving superior accuracy and adaptability compared to fixed-step baselines, delivering accuracy gains of 60-80 % and speed-ups of 30-40 % at inference time.

97 MATHEMATICS AND COMPUTING↗

Structured illumination for surface-resolved grazing-incidence X-ray scattering

Grazing-incidence (GI) scattering techniques are widely used to characterize thin films, offering high surface sensitivity and insight into morphology and structure. However, these approaches typically provide statistical averaged information due to elongated footprint or limited spatial resolution due to beam size. Here we introduce a method that combines structured illumination with GI X-ray scattering and leverages our computational imaging approach to resolve local structural details. We demonstrate that our method captures local features of an organic semiconductor thin film without the need for sample rotation as in tomography. The method expands GI techniques from statistical averaging to high-resolution imaging, thereby providing the capability for detailed analysis of local material properties, such as domain shape, orientation and polymorphism, which are critical for advancing material design towards more efficient and tailored materials.

97 MATHEMATICS AND COMPUTING↗