IER 555: Godiva Benchmark Update CED-2 (Final Design Report)

Abstract

The International Criticality Safety Benchmark Evaluation Project (ICSBEP) evaluation of the Godiva IV critical assembly, HEU-MET-FAST-086: GODIVA-IV DELAYED-CRITICAL EXPERIMENTS (HMF-086), was completed by Russ Mosteller. Five critical experiment configurations performed at the Los Alamos National Laboratory (LANL) Technical Area (TA)-18 were evaluated as acceptable benchmark cases. The five cases consist of four delayed critical configurations which differ in control rod positions and one prompt critical configuration. All cases calculated a lower $k_{eff}$ than measured by experiment. This data is referred to as the TA-18 Godiva IV benchmark in this report. In 2005, Godiva IV was disassembled for relocation to the Nevada Test Site (NTS), now Nevada National Security Site (NNSS), at the National Criticality Experiments Research Center (NCERC). Following the disassembly and subsequent reassembly and startup of Godiva IV at NCERC, additional information about the Godiva IV components was obtained. An errata note was added to the HMF-086 evaluation in the ICSBEP handbook to provide this new information until a revision to the benchmark evaluation could be performed. In addition to those corrections, there are differences between the Godiva IV assembly at TA-18 and the Godiva IV assembly at NCERC. These differences include both assembly-specific differences (differences in the safety block gap, differences in the control rod positions, a new NCERC Top Hat and contamination shield) as well as environmental differences, such as the size and shape of the experimental building where the assembly is located. An additional model with similar cases, referred to as the NCERC Godiva IV benchmark in this report, will be added to the revised HMF-086 to capture these additional differences. This will provide the best benchmark model of Godiva for use by those performing experiments at NCERC. The IER 555 CED-2 report documents the information that will be updated in the HMF-086 revision, both the corrections to the TA-18 Godiva IV benchmark and the subsequent changes to create a NCERC Godiva IV benchmark. It describes the measurements that will be performed for cases similar to those performed at TA-18. It also describes measurements that will be included in the evaluation as additional data.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Goda, Joetta Marie, Favorite, Jeffrey A., Grove, Travis Justin, Smith, Travis Austin. 2022-09-13. IER 555: Godiva Benchmark Update CED-2 (Final Design Report). https://doi.org/10.2172/1887118

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design-informed neutronics assessment of long-lived fission product transmutation in a tokamak fusion reactor blanket

This study presents a neutronics-based assessment of the feasibility and viability of transmuting six major long-lived fission products (LLFPs) from light-water reactors, namely 99 Tc, 129 I, 79 Se, 93 Zr, 126 Sn, and 135 Cs, within the blanket region of a tokamak fusion reactor, using the MIT ARC design as a concrete fusion configuration. Monte Carlo neutronics simulations were performed to evaluate LLFP transmutation and to compare the results with a reference boiling water reactor (BWR). The results indicate that transmutation of all six LLFPs is neutronics-feasible in fusion reactors, with transmutation half-lives significantly shorter than their natural decay half-lives. For elemental targets, transmutation of 135 Cs, 126 Sn, and 93 Zr was found potentially viable, as the net mass transmuted exceeded that achievable in the reference BWR under identical target volume and irradiation time. When isotopically separated targets were considered, transmutation of 126 Sn and 93 Zr appeared potentially viable. A parametric study demonstrated that plasma geometry modifications can enhance local neutron flux, increasing the transmuted 93 Zr mass by approximately 33% and reducing the transmutation half-life from approximately 240 years to 180 years. Repositioning the target and adjusting material layer thickness reduced the transmutation half-life of 93 Zr to 67 years and increased the net mass transmuted by a factor of 50. Furthermore, these results demonstrate that fusion reactors can enable LLFP transmutation beyond the practical limits of thermal fission reactors and highlight the critical role of reactor and blanket design optimization. Engineering and fuel-cycle considerations required for deployment are beyond the scope of this neutronics-focused study.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A hybrid Monte Carlo-deterministic second moment method with efficient variance reduction

In this work, we present a hybrid method that combines Monte Carlo with deterministic finite element methods to solve a linear Boltzmann transport equation. Our hybrid method runs orders of magnitude faster than Monte Carlo, without sacrificing accuracy, for a proxy problem from radiative transfer that contains both optically-thick and optically-thin material. We believe that this is the first demonstration of a hybrid Second Moment Method in more than one spatial dimension, the first to consider more than one material, and the first to use variance reduction. Our variance reduction approach arises from an asymptotic analysis in which we show that the magnitude of the scattering source grows without bound. We transform the problem to compute the deviation of the radiation intensity from isotropy. The magnitude of the source in the transformed problem is bounded, and the quality of the hybrid method solution is dramatically improved by a substantial reduction in the variance.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗