Search NASA⌕ Search

DOE OSTI · 1893413

Optimization Studies for the Long-Baseline Neutrino Facility at Fermilab

Abstract

The Deep Underground Neutrino Experiment and Long-Baseline Neutrino Facility (DUNE-LBNF) are under development at Fermilab since early 2010s [1]. At present, the work is being performed towards a comprehensive review conducted by US Department of Energy (DOE)-the Critical Decision 2 (CD-2)-that is planned to take place in the middle of 2022. The primary scientific objectives of DUNE are to carry out a comprehensive investigation of neutrino oscillations to test CP violation in the lepton sector, determine the ordering of the neutrino masses, and to test the three-neutrino paradigm (electron, muon and tau neutrino). The LBNF will provide a 120-GeV proton beam on a neutrino production target utilizing a new 800-MeV superconducting Linac which is expected to be completed in 2027 [2]. The neutrino beamline, which utilizes a target and horn systems, decay pipe, hadron absorber and other systems, is a core component of the LBNF. At present-as a result of numerous iterations-there exists an optimized design with a 1.5-m graphite target and focusing system consisting of three horns. Further optimization energy deposition and radiological calculations are performed towards CD-2 and beyond. This paper describes results of the most recent MARS15 [3] optimization studies.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Rakhno, Igor, Mokhov, Nikolai, Tropin, Igor, Striganov, Sergei. 2022-10-14. Optimization Studies for the Long-Baseline Neutrino Facility at Fermilab. https://www.osti.gov/biblio/1893413

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗