DOE OSTI · 1898063

Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16; Addendum Part I for Delineating BH-056

Abstract

On July 11, 2022, Sandia National Laboratories in California (SNL/CA) submitted a Response to Regional Water Quality Control Board Comments on Soil Sampling Results for Closure of a Portion of SWMU #16 in response to the February 16,2022 San Francisco Bay Regional Water Quality Control Board’s (SFRWQCB) letter requesting supporting information for the recommended closure of 7,700 linear feet of abandoned sewer lines. On August 18, 2022, SFRWQCB further requested a Sampling and Analysis Plan (SAP) for additional “step-out” sampling to delineate the potential presence of benzidine near borehole BH-056, which is located near the former sewer line. SNL/CA is in the process of contracting Weiss Associates (Weiss) to perform and oversee the boring, sampling, analysis, and report development to determine the potential presence and extent of benzidine. This document outlines the work that is anticipated, including the development of the SAP, to complete the investigation and submit a final report to the SFRWQCB. The work proposed by Weiss provides an estimated schedule for completing the investigation and developing the addendum Part II SAP for the project. In addition, Weiss provided a preliminary estimate of the sample locations (see Attachment A) which serve as addendum Part I of the SAP requested by the SFRWQCB. The contractor will submit the addendum Part II SAP, to satisfy the SFRWQCB requirement, before proceeding with any work.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Manger, Trevor. 2022-11-07. Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16; Addendum Part I for Delineating BH-056. https://doi.org/10.2172/1898063

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Water4Energy Step-1 Band-M Ready-to-Train Samples for TVA Weeks-to-Years Prediction, Version 0

AI-ready Band-M (monthly) labelled training pack for the Water4Energy Genesis Task-1 project on weeks-to-years prediction of Tennessee Valley temperature and precipitation. The deposit includes leakage-aware issue-time samples (samples_M_v0.nc; N=486), train-only scalers, issue-time split table, supporting monthly panels, and Python generation scripts to recreate the pack from the companion Tier-1 raw observation collection (https://doi.org/10.13139/ORNLNCCS/3398576). Each sample pairs a 12-month lookback of teleconnection indices and SST box anomalies with TVA-mean ERA5 anomaly targets (t2m, tp, msl) at leads 1–3 months.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, particle analysis

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, time bins

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗