Abstract

This final report summarizes the research findings of the current project. This project is a collaboration between New Mexico State University (NMSU) as a lead (Recipient) and Arizona State University (ASU) as a Co-Recipient. Tubular structures are common components of boilers and heat exchangers in power plants. Over time, these components may suffer corrosion, cracks, and stress-corrosion cracks in either the body or the welded connections. A single tube leakage can cause an outage of several weeks. Regular inspection is a key safety factor when ensuring that power plants are maintained in reliable, operational condition. This inspection, however, is challenging, time-consuming, and in many cases impossible due to accessibility issues and safety concerns. Recent developments in robotic-based inspection can offer a great solution. Hard-to-reach places can be inspected without overhauling the unit, saving time and cost. Although several robots have been designed and implemented successfully for inspecting power plant components, in particular tubular structures, their mobility and flexibility are limited. Most of these robots use wheels for mobility which reduces their maneuverability of these robots. Moreover, they usually use magnets to attach to tubes which will not work on tubes with non-ferromagnetic materials. These robots usually carry measurement tools for a particular non-destructive testing (NDT) method such as ultrasound testing (UT) that requires a couplant to perform a point-by-point (scanning) inspection of the tubular structure. In this project, we developed a versatile lizard-inspired tube inspector (LTI) robot with embedded inspection sensing components for tube inspection which removes the need for point-by-point scanning of tube surface for crack and corrosion detection. Inspired by a “lizard”, the novelty of the current project is the integration of couplant-free ultrasound sensing and transmission, advanced data-driven defect detection and imaging, and friction-based mechanical mobility components in a single robot to eliminate a need for smooth surfaces and simple geometry for mobility and scanning. The LTI robot could replace the wheel-based approach with friction-based mobility to significantly increase the flexibility and maneuverability of the robot. The LTI robot can get into a power plant unit, such as a boiler, from a small area allowing it to access a component of interest for inspection (e.g., move on OD, curved and flat surfaces, non-ferromagnetic or ferromagnetic materials, and tubes with rough surfaces and complex geometries). Additionally, an advanced data-driven method using ultrasound data was pioneered to allow the robot to detect defects in the entire area between the robot’s multi-functional mobility system (grippers). Integrating a couplant-free ultrasound sensing in the robot’s grippers as well as using advanced data-driven methods allowed the LTI to detect defects in the entire cross-section of a tube using its grippers when stationary and when mobile.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Dehghan-Niri, Ehsan, Marvi, Hamidreza. 2023-01-10. A Lizard-inspired Tube Inspector (LTI) Robot. https://doi.org/10.2172/1902695

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Designing a Robust MEA-Based Post-Combustion Carbon Capture Process with Capture Rate Guarantees

This work presents an application of the nonlinear two-stage robust optimization solver PyROS to the model-based design and operation of a monoethanolamine scrubbing process for CO<sub>2</sub> capture under epistemic uncertainty. Through this application, risk-averse process designs are successfully obtained for CO<sub>2</sub> capture targets ranging from 90% to over 99%. In particular, the risk-averse solutions for CO<sub>2</sub> capture targets of up to 98% are shown to be only marginally more expensive than their nominally optimal counterparts. Thus, the results demonstrate the utility of recently developed nonlinear robust optimization approaches for the solution of large-scale chemical process models under uncertainty.

20 FOSSIL-FUELED POWER PLANTS↗

Optimal Design and Techno-Economic Analysis of 3D-Printed, Intensified Packings for Absorbers and Strippers in Solvent-Based CO 2 Capture

A potential technology for the CO 2 absorption process is utilizing intensified structured packing with embedded cooling/heating channels for continuous heat exchange, which can overcome limitations of discrete methods, such as discrete intercooling and centralized reboilers, to aid in reducing energy consumption and decreasing costs. This work investigates the modeling of intensified packing (IP) for the stripper tower, extending on previous work for the absorber, which distributes heat internally within the column, improving the thermodynamics for the solvent regeneration process. The model includes submodels for steam turbine extraction to produce steam at various qualities as well as a surrogate model for calculating steam enthalpy. A cost model for a plant-scale absorption capture process was developed, allowing for the design of the plant to be optimized, subject to minimizing capture cost using two different power plant flue gas sources. In this optimization, the placement of IP in both towers is optimized to balance the trade-off between enhanced heat transfer and reduced mass transfer volume. For natural gas combined cycle flue gas, the standard process configuration had a minimum cost of $\$$65.40/tonne CO 2 , and considering IP, the minimum capture cost is reduced to $\$$62.73/tonne, with utilization in the stripper column, which reduces yearly costs by up to $\$$2.67 MM/yr. Cooling the absorber through IP, or intercoolers, was only found to be beneficial at higher capture rates, with IP in both towers having a cost of capture of $\$$68.08/tonne at 99.9% capture, a reduction of $\$$12.64/tonne when using only intercoolers at the same capture rate. When capturing from pulverized-coal power plants, the minimum cost of capture when using IP in both towers is $\$$44.18/tonne (at 97% capture), while the standard configuration with and without intercoolers was $\$$45.69 and $\$$47.22 per tonne, respectively. This results in a reduction in yearly costs of $\$$16.98 MM/yr from the base-case configuration. At this higher CO 2 concentration, cooling in the absorber from the IP becomes extremely beneficial, reducing energy consumption by up to 6%.

20 FOSSIL-FUELED POWER PLANTS↗

Transformational Molecular Layer Deposition Tailor-Made Size-Sieving Sorbents for Post-Combustion CO 2 Capture

This report summarizes the carbon capture research and development conducted by The State University of New York at Buffalo (UB), University of South Carolina (USC), GTI Energy (GTI), and Rensselaer Polytechnic Institute (RPI) for U.S. Department of Energy (DOE) project DE-FE0031730 titled “Transformational Molecular Layer Deposition Tailor-made Size-Sieving Sorbents for Post-Combustion CO 2 capture.” The objective of this project was to develop a transformational molecular layer deposition (MLD) tailor-made size-sieving sorbent integrated with a pressure swing adsorption (PSA) cycle schedule that can be installed in new or retrofitted into existing pulverized coal (PC) power plants for CO 2 capture with a cost of electricity at least 30% lower than a supercritical PC power with CO 2 capture, or approximately $\$$30 per tonne of CO 2 captured, and with it being ready for demonstration by 2030.

20 FOSSIL-FUELED POWER PLANTS↗