DOE OSTI · 1959573
Site 300 Small Firearms Training Facility Project Soil Sampling and Analysis Plan
Abstract
Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is planning to execute a construction project at the Small Firearms Training Facility within LLNL's Experimental Test Site, Site 300 (S300). The proposed project will include extensive dirt work from a removal of a berm, the installation of a cinder block wall, and the replacement of a canopy and a fence with an access gate. This Sampling and Analysis Plan (SAP) outlines the procedures to collect environmental samples for the management and/or disposition of excess soil generated from the project site and geotechnical samples for building pad and pavement designs. This SAP has been prepared and is organized to be consistent with LLNL's Soil Screening and Management Plan (SSMP) (LLNL, 2021), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) programs (EPA, 2006).
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Felish, Aaron M.. 2022-12-07. Site 300 Small Firearms Training Facility Project Soil Sampling and Analysis Plan. https://doi.org/10.2172/1959573
Cite the original work for its findings. Save a collection to share your selection of sources.