DOE OSTI · 1968485
Updated Baseline Cost Model for Hydropower (2023)
Abstract
The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Oladosu, Gbadebo, Sasthav, Colin. 2023-04-01. Updated Baseline Cost Model for Hydropower (2023). https://doi.org/10.21951/bcm2023%2F1968485
Cite the original work for its findings. Save a collection to share your selection of sources.