Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Felish, Aaron M., Ramirez, Reginald M.. 2023-02-01. U328 Electrical Reliability Project Soil Sampling and Analysis Plan. https://doi.org/10.2172/1970214

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Water4Energy Step-1 Band-M Ready-to-Train Samples for TVA Weeks-to-Years Prediction, Version 0

AI-ready Band-M (monthly) labelled training pack for the Water4Energy Genesis Task-1 project on weeks-to-years prediction of Tennessee Valley temperature and precipitation. The deposit includes leakage-aware issue-time samples (samples_M_v0.nc; N=486), train-only scalers, issue-time split table, supporting monthly panels, and Python generation scripts to recreate the pack from the companion Tier-1 raw observation collection (https://doi.org/10.13139/ORNLNCCS/3398576). Each sample pairs a 12-month lookback of teleconnection indices and SST box anomalies with TVA-mean ERA5 anomaly targets (t2m, tp, msl) at leads 1–3 months.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, particle analysis

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, time bins

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗