Hydropower is the world's largest source of renewable electricity, and hydropower plants are distributed all over the world. Typical major components of a hydropower plant are the governor, excitation, generator, thrust bearing, hydraulic turbine, transformer, the main lead, metering and control, tailwater depression, and dissolved oxygen. For each component, various measures are taken. The measurements are acquired by various heterogeneous systems, including standalone sensors, programmable logic controllers (PLC), Supervisory control and data acquisition (SCADA), Internet of Things (IoT), and data acquisition and integration platforms such as OSI/PI. The measured data are often archived within the plant by a data management platform, and many institutions have cloud-based archive systems, such as Hydropower Research Institution (HRI), U.S. Army Corps of Engineers (USACE), and Columbia River Data Access in Real Time (DART). Object Modeling is a general framework for designing information systems. It focuses on objects, the actions they perform, and the messages they send to one another to cause those actions to be taken. The major differences among object modeling, network modeling, data modeling, and process modeling are that in the first we focus on the actions in response to information, objects which form the system, the actions they perform, and how they pass information to one another, while in the second we concentrate on where, when and how much information is moved, while in the third we focus on what information is moved and where it is moved, while in the last we focus on how it is moved and when it is moved. Object modeling was developed basically as a method to develop object-oriented systems and to support object-oriented programming. It describes the static structure of the system. The object Modeling Technique is easy to draw and use. That is why we choose object modeling to connect physical hydropower plants to Digital Twin. It recognizes the objects and the relationship between them. It identifies the attributes and functions of each class. Dynamic Modeling: It explains how objects respond to events. Functional Modeling indicates the processes executed in an object and how data changes when it moves to objects. It has been used in many applications like telecommunication, transportation, etc.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Hou, Hongfei, Ahmed, Osman. 2023-02-01. Digital Twin for Hydropower System Object Modeling: Alder Dam (FY2023). https://doi.org/10.2172/1985704

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗