DOE OSTI · 1988511
Report from the Fermilab Proton Intensity Upgrade Central Design Group
Abstract
This document is the primary output of the Proton Intensity Upgrade Central Design Group (PIU CDG) which was convened in the summer of 2022. The Group was asked to study options and provide recommendations for upgrading the Fermilab Accelerator Complex including increased reliability and capability and a focus on increasing the proton intensity to the LBNF beamline. Several approaches and combinations of approaches were examined for capability, cost, schedule, risks, and necessary R&D
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Ainsworth, Robert. 2023-07-10. Report from the Fermilab Proton Intensity Upgrade Central Design Group. https://doi.org/10.2172/1988511
Cite the original work for its findings. Save a collection to share your selection of sources.