Search NASA⌕ Search

DOE OSTI · 1995809

Airport Infrastructure Planning Using Multi-Stage Stochastic Programming

Abstract

The Athena project, funded by the Department of Energy, has worked to identify the critical infrastructure at Dallas Fort Worth (DFW) Airport which influences mobility between the airport and the surrounding city of Dallas. Using scalable methods that can leverage HPC resources we have developed a multi-stage stochastic infrastructure expansion model for determining parking and curb modifications to the DFW Airport over a 20-year horizon. Additionally, we have explored the impacts of congestion pricing in conjunction with infrastructure modifications. Our multi-stage stochastic model is implemented using the mpi-sppy software and solved in parallel using progressive hedging on the National Renewable Energy Laboratory's HPC system Eagle. In this talk we present results from solving this model at scale.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Sigler, Devon, Liu, Zhaocai (ORCID:0000000230166832), Wang, Qichao (ORCID:0000000208634564), Ugirumurera, Juliette, Ge, Yanbo, Severino, Joseph, Phillips, Caleb (ORCID:0000000236654239), Lunacek, Monte, Knueven, Bernard. 2023-08-14. Airport Infrastructure Planning Using Multi-Stage Stochastic Programming. https://www.osti.gov/biblio/1995809

Cite the original work for its findings. Save a collection to share your selection of sources.