Search NASA⌕ Search

DOE OSTI · 1996377

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Abstract

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Katipamula, Srinivas, Fernandez, Nicholas EP, Smith, Amanda D., Rogers, Austin P.. 2020-01-01. Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems. https://doi.org/10.2172/1996377

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗