DOE OSTI · 1998621
Charging Needs for Battery Electric Semi Trucks
Abstract
Battery-electric vehicles provide a pathway to decarbonize heavy-duty trucking, but the market for electric trucks is nascent, and specific charging requirements remain uncertain. This paper summarizes methods and findings from Charging Needs for Electric Semi-Trailer Trucks [1] wherein we leverage large-scale vehicle telematics data (>205 million miles of driving) to estimate the charging behaviors and infrastructure requirements for U.S. battery-electric semi-trailer trucks within three operating segments: local, regional, and long-haul. We model two types of charging - mid-shift (fast en-route charging) and off-shift (slow depot charging) - and show that off-shift charging at speeds compatible with current light-duty charging infrastructure (i.e., =350 kW) can supply 35% to 77% of total energy demand for local and regional trucks with =300-mile range. Megawatt-level speeds are required for mid-shift charging, which make up 44% to 57% of energy demand for long-haul trucks with =500-mile range. However, the role of off-shift charging increases as the range for battery-electric trucks increases and when off-shift charging is widely available.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Borlaug, Brennan (ORCID:0000000191421641), Alexander, Marcus, Muratori, Matteo (ORCID:0000000316886742). 2023-06-14. Charging Needs for Battery Electric Semi Trucks. https://www.osti.gov/biblio/1998621
Cite the original work for its findings. Save a collection to share your selection of sources.