DOE OSTI · 20969905

Ground control for highwall mining

Abstract

Perhaps the greatest risk to both equipment and personnel associated with highwall mining is from ground control. The two most significant ground control hazards are rock falls from highwall and equipment entrapment underground. In the central Appalachians, where the majority of highwall mining occurs in the USA, hillseams (or mountain cracks) are the most prominent structure that affects highwall stability. The article discusses measures to minimise the risk of failure associated with hillstreams. A 'stuck' or trapped highwall miner, and the ensuring retrieval or recovery operation, can be extremely disruptive to the highwall mining process. Most entrapment, are due to roof falls in the hole. The options for recovery are surface retrieval, surface excavation or underground recovery. Proper pillar design is essential to maintain highwall stability and prevent entrapments. NIOSH has developed the Analysis of Retreat Mining Pillar stability-Highwall Mining (ARMPS-HWM) computer program to help mine planners with this process. 10 figs.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Zipf, R K, Mark, C. 2007-09-15. Ground control for highwall mining. https://searchnasa.com/record/osti%3A20969905/ground-control-for-highwall-mining

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

Wyoming Trails Carbon Hub (WyoTCH)

The Wyoming Trails Carbon Hub (WyoTCH) project completed a front-end engineering and design (FEED) study for a commercial-scale, open-access carbon dioxide (CO 2 ) transport pipeline in Wyoming under U.S. Department of Energy (DOE) Award DEFE0032347, funded through the Bipartisan Infrastructure Law Carbon Capture Technology Program and administered by the National Energy Technology Laboratory. The project’s approach of designing a multi-source, multi-destination pipeline, rather than a dedicated line serving a single project, would lower the barrier to entry for individual CO 2 projects. The projects would leverage Wyoming's concentrated industrial and power generation CO 2 sources, its existing CO 2 pipeline infrastructure, and its extensive CO 2 storage and utilization capacity. This is the project's final technical report.

01 COAL, LIGNITE, AND PEAT↗

Engineering-Scale Validation of Novel Algae CO 2 Capture and Bioproducts Technology

The purpose of this project was to advance and scale the algae-based technology Helios-NRG has been developing for capture of CO 2 from the flue gas of coal-burning power plants with conversion of the CO 2 to high-value products. In order to encourage the process becoming commercial and be adoptable, it is essential that the cost of CO 2 be close to net zero or slightly revenue positive. Two methods to achieve this are reducing the cost of operations through efficiencies and selling of products derived from conversion. Helios and the project team partners have accomplished the goals of furthering the technology to be more scalable and substantially lower cost with a defined pathway for commercialization.

01 COAL, LIGNITE, AND PEAT↗

Innovative Biomonitoring and Remediation of Heavy Metals Using Phytotechnologies at the Savannah River Site (SRS) Coal Combustion Product (CCP) Impoundment Sites

The Savannah River Site (SRS) contains legacy coal combustion product (CCP) impoundments that are impacted by elevated concentrations of heavy metals and radionuclides, posing long-term risks to soil health, ecosystem functioning, and environmental sustainability. Traditional environmental monitoring approaches rely primarily on chemical analyses to quantify contaminant concentrations but often provide limited information regarding biological responses or ecosystem recovery. This project addressed these limitations by integrating environmental chemistry, microbial ecology, artificial intelligence (AI), and bioremediation into a comprehensive framework for environmental diagnostics and restoration of contaminated soils. The overarching goal of this collaborative project between Florida A&M University (FAMU) and the University of Georgia's Savannah River Ecology Laboratory (SREL) was to develop innovative biomonitoring and remediation strategies for heavy metal-contaminated CCP impoundment sites at the Savannah River Site. Specifically, the project sought to (i) characterize heavy metal contamination, (ii) determine microbial responses to contamination, (iii) isolate indigenous heavy metal-resistant microorganisms for remediation applications, (iv) develop a microbial ecological health index using machine learning, and (v) optimize fungal-mediated bioremediation using artificial intelligence.

01 COAL, LIGNITE, AND PEAT↗