Probing-Based Inertia Estimation Method Using Hybrid Power Plants

Abstract

With the displacement of synchronous generation by inverter-based resources (IBRs), power systems could face the challenge of reduced inertia since IBRs do not inherently contribute to system inertia. Therefore, there is rising interest in monitoring system inertia in real-time applications for situational awareness. In addition, there is a growing number of IBRs that provide fast frequency responses (FFR) in the form of synthetic inertia and P-f droop. It is desirable to quantify the contribution of these FFR controls as equivalent inertia. This paper proposes a probing-based inertia estimation method using a PV-battery hybrid power plant in the Kauai island power system. The method is validated under different operating conditions.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Jiang, Zhihao, Yin, He, Li, Hongyu, Liu, Yilu, Tan, Jin (ORCID:0000000205997730), Hoke, Andy (ORCID:0000000267917812), Rockwell, Brad, Kruse, Cameron. 2023-09-25. Probing-Based Inertia Estimation Method Using Hybrid Power Plants. https://doi.org/10.1109/pesgm52003.2023.10252847. https://searchnasa.com/record/osti%3A2229078/probing-based-inertia-estimation-method-using-hybrid-power-plants

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

Dynamic Interaction of Grid-Forming and Grid-Following Inverters with Synchronous Generators in Hybrid Power Plants

As the integration of renewable energy resources such as wind and solar generation continues to grow, the use of hybrid power plants with both synchronous machines and power electronic inverters operating in parallel becomes more common. This paper studies the impact on small-signal stability for these pairs of devices, first as an isolated two-device system and then as part of a 9-bus test system. Each operational scenario was studied with both a grid-following inverter and a grid-forming inverter. In each scenario, the state variables associated with the synchronous generator's excitation system were found to be responsible for the inception of instability. These results underscore the importance of accurate modeling of excitation systems when modeling power systems with hybrid power plants.

hybrid power plant↗