Search NASA⌕ Search

DOE OSTI · 2279800

Disrupting EV Charging Sessions and Gaining Remote Code Execution with DoS, MITM, and Code Injection Exploits using OCPP 1.6

Abstract

Open Charge Point Protocol (OCPP) 1.6 is widely used in the electric vehicle (EV) charging industry to communicate between Charging System Management Services (CSMSs) and Electric Vehicle Supply Equipment (EVSE). Unlike OCPP 2.0.1, OCPP 1.6 uses unencrypted websocket communications to exchange information between EVSE devices and an onpremise or cloud-based CSMS. In this work, we demonstrate two machine-in-the-middle (MITM) attacks on OCPP sessions to terminate charging sessions and gain root access to the EVSE equipment via remote code execution (RCE). Second, we demonstrate a malicious firmware update with a code injection payload to compromise an EVSE. Lastly, we demonstrate two methods to prevent availability of the EVSE or CSMS. One of these, originally reported by SaiFlow, prevents traffic to legitimate EVSE equipment using a DoS-like attack on CSMSs by repeatedly connecting and authenticating several CPs with the same identities as the legitimate CP. These vulnerabilities were demonstrated with proof-of-concept exploits in a virtualized Cyber Range at Wright State University and/or with a 350 kW Direct Current Fast Charger (DCFC) at Idaho National Laboratory. The team found that OCPP 1.6 could be protected from these attacks by adding secure shell (SSH) tunnels to the protocol, if upgrading to OCPP 2.0.1 was not an option. Index Terms—Electric vehicle charging, cybersecurity, OCPP, cyberattack, cyber-resilience. INSPEC Accession Number: 23981565

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Johnson, Jay, II, David Elmo, Fragkos, George, Zhang, Junjie, Rohde, Kenneth W, Salinas, Sean C. 2023-11-27. Disrupting EV Charging Sessions and Gaining Remote Code Execution with DoS, MITM, and Code Injection Exploits using OCPP 1.6. https://www.osti.gov/biblio/2279800

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗